62%
Contract: QAR 1,477,781Earned: QAR 919,700

1

Villa

62%

Overall Completion

QAR 1,477,781.48

Contract Value

QAR 919,700.27

Earned Value

Completion: 62%

·

Contract value: QAR 1,477,781.48

·

Earned: QAR 919,700.27

ItemDescriptionQuantity% DoneActions
GENERAL
91%
A.1

Allow for project manager and project coordination, obtaining Landlord work permits, maintance permit, and necessary inspections.

N/A
1
91%
A.2

Allow for clearing of all debris/rubbish from site on a day to day basis keeping the site workable at all times

N/A
1
100%
A.3

Allow for site establishment, including mobilization, maintenance during construction period of temporary equipment on project completion

N/A
1
100%
A.4

Allow for final cleaning

N/A
1
75%
FLOOR FINISHES
91%
B.1

Supply & apply hand mixed sand cement screed for all floor Cement from local brand made in Qatar for up to 15cm

N/A
703m²
100%
B.2

Installation of floor tiles with work related materials like tile adhessive , tiles grout , spacer. tiles supplied by client( TILES BY CLIENT SUPPLY( Marble glue to be local brand)

N/A
703m²
94%
B.3

Supply and Installation of Stairs Of solid meranti wood as per client design with led below and plaster and paint riser / or Ceramic steps with wood design with adhessive & finished with special grout incl led below and plaster and paint riser ( Marble glue to be local brand)

N/A
1
52%
B.4

Supply & apply Bitumin paint & 4mm membrane sheet & upto 150Mm sand cement screed for ALL BATHROOM floors( Bitumin and Membrane to be from a local brand)

N/A
97m²
100%
WALL FINISHES AND CLADDING DESIGNS
81%
C.2

Supply & apply 1 coat primer , 2 coat stucco & final coat to be determined by consultant, fenomastic matt paint for all internal wall ( PRICE INCLUDES STICHING AND CRACK REPAIRS OF WALL PLASTER WHERE NEEDED)

N/A
1,535m²
75%
C.3

Supply & apply 1 coat primer , 2 coat jotashield paint for external BOUNDRY wall

N/A
477m²
52%
C.4

Installation ONLY of wall tiles ( Wet areas & kitchen )with work related materials like tile adhessive , tiles grout , spacer.( all transition strips supplied by client)TILES SUPPLIED BY CLIENT( MATERIALS FROM LOCAL MAKE AND BRAND)

N/A
405m²
100%
EXTERIOR ELEVATION
57%
C.1.4

TEXTURED JOTUN EXTERIOR PAINT 1 COAT PRIMER AND 2 COATS FINAL PAINT

N/A
1,150m²
58%
C.1.5

ALUMINIUM DESIGN PANELS OVER WINDOWS / BLOCK WORK AND PLASTER OVER SHAFTS

N/A
110m²
54%
WALL MOULDING DESIGNS
GROUND FLOOR
0%
D.1

DINING

N/A
56
0%
D.2

LIVING

N/A
84
0%
D.3

LADIES MAJLIS4

N/A
196
0%
D.4

LIVING AREA

N/A
70
0%
FIRST FLOOR
0%
D.6

BEDROOM 1

N/A
185
0%
D.7

BEDROOM 2

N/A
145
0%
D.8

BEDROOM 3

N/A
145
0%
CIVIL
66%
E.5

Supply & installation of hollow block with plaster finish for shaft

N/A
1
100%
E.6

Supply & install boundry gate AS PER DESIGN FOR CAR ENTERANCE and small GATE FOR PEDESTRIANS AS PER DESIGN (MATERIALS TO BE MILD STEEL WITH BLACK HIGH STRENGTH MATT MASS PAINTS FINISH)) ( 80MMX40MM FRAME ON TRACK WITH WHEELS 4MM INNER PLATED DESIGN TO MATCH RENDER) ( AUTOMATIC GATE MOTOR INCLUDED BRAND TO BE FROM EUROPE)

N/A
1
0%
E.7

Squaring off concrete on villa face TO MATCH THE DESIGN WITH 2 X SLABS ON TOP AND BOTTOM OF ALUMINIUM LOOVERS WITH HOLLOW BLOCK AND PLASTER

N/A
—
100%
E.8

Supply and install hand mix wall plaster for exterior walls( cement to be from a local brand)Including boundary wall plaster( quote excludes front of villa)

N/A
660
100%
E.9

Supply and install hollow blocks to make changes to interor walls including plaster and including breaking existing walls as per consultant drawings)

N/A
210
100%
E.10

Supply and install hollow blocks to make changes to interior wall in master bedroom bathroom to create niches as per design by client

N/A
10
100%
E.11

Supply and Construct concrete/steel slabs/roof for kitchen and penthouse extension including new columns as per required on site

N/A
10
0%
E.12

Supply and Construct BLOCK & PLASTER wall for kitchen to be demolished after completion certificate( single layer inside and single outside materials to be of local brand ,incl Paint and joint tape)

N/A
1
100%
CEILING FINISHES
95%
F.1

Supply & installation of double step 12mm gypsum board ceiling with thread rod and C channel clip suspension system for GF & FF & annexes 600MMX600MM GRIP LAYOUT(standard for open areas/ fire rated for kitchen and water resistant for wet area) All materials to be of a local brand chosen by supplier( INCLUDING CEILING CORNICH AS PER CLIENT REQUESTED DESIGN)

N/A
535m²
95%
F.2

Supply & installation of single step 12mm regular gypsum board ceiling with thread rod and C channel clip suspension system for PH (standard for open areas/ fire rated for kitchen and water resistant for wet area) All materials to be of a local brand chosen by supplier

N/A
165m²
95%
F.3

Supply & apply joint tape finish , 1 coat primer , 2 coat stucco & 2 coat Jotun interior matt paint for all ceiling

N/A
700m²
95%
MEP
94%
G.1

Supply & installation of all piping , wirring , backbox , Main DB & others DB include all circuit breaker , armoured cables , Isolator , Installation of all fixtures , lights, bitumen for holding tank , Db testing & commissioning .( Budget ofSockets and switches and spot lights to be from china basic white QAR 10 per item) ( Chandlier and led strips excluded , All fixtures , lights AND SOCKETS TO BE BASIC WHITE SAMPLES TO BE SUBMITED) (All materials to be turkish or Oman)

N/A
1
94%
G.3

Supply & install all drainage pipes & fittings, connect pipe each manhole /supply covers and bitumen finishing . Supply & install all water supply pipes , fittings , Water pump , water heater , Water tank as per materials specification page . Installation of all bathroom sanitery ware and vanities, tap , mixers ( water supply pipes Turkish or Oman) ( pump System European) (ALL VANITIES, BASINS , TOILETS AND BATHROOM ACCESSORIES SUPPLIED BY CLIENT)

N/A
1
91%
G.4

HVAC BY CLIENT NOT IN SCOPE( Plinth for outdoor units included in BR scope)

N/A
—
100%
G.5

Supply & installation of Bitumin paint , 4mm membrane sheet , 4cm thermal insulation foam with GEO textile & upto 5cm concrete screed for Rooftop & roof deck and annex buildings with waterproof paint and texture cloth( completed and done by TADMUR)( materials to be from Qatar or Saudi origin)

N/A
275m²
100%
MEP
LOW VOLTAGE
100%
G.2

Low power : Supply & Install Piping , wirring & backbox work , fixtures installation only ( fixtures supplied by client )

N/A
1
100%
Doors & Windows
89%
H.1

Supply and Installation of main door of villa UPVC/WPC AND ALUMINIUM TO MATCH MAIN DOOR 3D AS BEST AS POSSIBLE COLOUR TO BE SELECTED BY CONSULTANT AND CLIENT

N/A
1
88%
H.2

Supply and Installation of main door of Majlis UPVC/WPC AND ALUMINIUM TO MATCH MAIN DOOR 3D AS BEST AS POSSIBLE COLOUR TO BE SELECTED BY CONSULTANT AND CLIENT

N/A
1
0%
H.3.1

Supply and Installation of upvc or aluminium doors for non interior door locations ( IRONMONGERIES TO BE BASIC STAINLESS STEEL BRUSHED or black Chinese Make and model)

N/A
9
90%
H.4

Supply and Installation of UPVC Windows for villa ( Turkish Black UPVC)DOUBLE GLAZED GLASS COLOUR TO BE SELECTED BY CONSULTANT AND CLIENT

N/A
1
95%
Elevator
90%
I.1

Stainless steel elevator cabin with etched design finish, mirrors, and a 630 kg capacity. Model 6, MRL Elevator, 2024, suitable for indoor use. Warranty included. double sided entry( Brand Fuji)

N/A
1
90%
Joinery
0%
J.2

GF TV WALL UNIT AS PER 3D DESIGN LIVING ROOM GYPSUM WORK ONLY TO MAKE TV UNIT NO WOOD OR MARBLE INCLUDED

N/A
1
0%
J.3

GF WALL cladding GYPSUM WORK cladding with led lights including moulding( Materials to be from a local brand chosen by supplier)

N/A
60
0%
J.4

HAND RAIL FOR STAIRS MADE OUT OF Meranti solid WOOD STANDARD WALL MOUNTED 15CM X 7CM RAIL NOT AS PER 3D DESIGN ( inlcuding led strip below)

N/A
1
0%
Landscapping
0%
K.1

Installation ONLY of tiles for around of the EXTERIOR OF THE villa /TILES SUPPLIED BY CLIENT/including any backfill( Materials to be of local brand)

N/A
200m²
0%
VO-01 Demolition & Block Work
100%
1.1

Supply and install 10 cm blockwork above toilets in all bathrooms to create niches with concealed lighting, including all blockwork for additional walls in the bathrooms.

N/A
1
100%
1.1

Supply and install additional blockwork to the boundary walls to increase the height by two (2) blocks.

N/A
1
100%
1.1

Supply and install aluminium skirting profile flush with the wall, as per the client's request. (Budget for aluminium profile 20 QAR per meter)

N/A
268
100%
1.1

Demolition of wall to make new window 1650mm x 1350mm (and removal of rubbish).

N/A
2.22m²
100%
1.1

Demolition of wall partition 4200mm x 4200mm (and removal of rubbish).

N/A
17.64m²
100%
1.1

Build new wall 4200mm x 4200mm.

N/A
17.64m²
100%
1.1.1

Building new wall 8000mm x 3350mm (original — removed).

N/A
26.8m²
100%
1.1.1 Rev

Building new wall 8000mm x 3350mm (revised).

N/A
2.68m²
100%
1.1.2

Demolition of existing wall 8000mm x 335mm (and removal of rubbish).

N/A
26.8m²
100%
2.1

Demolition of wall to make new door 2850mm x 2500mm (and removal of rubbish).

N/A
7.12m²
100%
2.1

Demolition of wall to make new window 600mm x 3100mm (and removal of rubbish).

N/A
1.86m²
100%
2.1

Modify, demolition reopen new door in bathroom 900mm x 2400mm (and removal of rubbish).

N/A
2.16m²
100%
2.1

Modify, demolition reopen new door in dressing room 900mm x 2400mm (and removal of rubbish).

N/A
2.16m²
100%
3.1

Demolition of bathroom 4250mm x 4000mm (and removal of rubbish).

N/A
16.8m²
100%
3.1

Demolition of dressing room wall, new door 2400mm x 900mm (and removal of rubbish).

N/A
2.16m²
100%
3.1

Demolition of bathroom room wall, new door 2400mm x 900mm (and removal of rubbish).

N/A
2.16m²
100%
3.1

Demolition, modify new window closing old and making new opening in room 3160mm x 900mm (and removal of rubbish).

N/A
2.84m²
100%
3.1

Demolition, modify new window closing old and making new opening in bathroom 3160mm x 600mm (and removal of rubbish).

N/A
2.84m²
100%
4.1

Demolition of all bedroom walls 4250mm x 4000mm (and removal of rubbish).

N/A
17m²
100%
4.1

Demolition, modify new window closing old and making new opening in room 3200mm x 1200mm (and removal of rubbish).

N/A
1.92m²
100%
4.1

Demolition, modify new window closing old and making new opening in bathroom 3200mm x 600mm (and removal of rubbish).

N/A
1.92m²
100%
5.1

Close existing window in pantry 600mm x 2700mm.

N/A
1.62m²
100%
5.1

Close existing window in gym 1300mm x 2700mm.

N/A
3.51m²
100%
5.1

Modify, demolition wall for new window in gym 1300mm x 2700mm (and removal of rubbish).

N/A
3.51m²
100%
5.1

Modify, demolition wall for new window in gym 600mm x 2700mm (and removal of rubbish).

N/A
1.62m²
100%
5.1

Modify, demolition wall for new window in gym 600mm x 2700mm (and removal of rubbish). [2]

N/A
1.62m²
100%
5.1

Breaking / closing wall to relocate door 2400mm x 900mm (and removal of rubbish).

N/A
2.16m²
100%
VO-01 Electrical Changes
100%
6.1

Relocate wall light points (piping, wiring and chipping).

N/A
52
100%
6.1

Relocate switch points (piping, wiring and chipping).

N/A
19
100%
6.1

Relocate sockets (piping, wiring and chipping).

N/A
43
100%
6.1

Relocate AC thermostat points (piping, wiring and chipping).

N/A
6
100%
6.1

Relocate AC drainage points (piping, wiring and chipping).

N/A
5
100%
6.1

Relocate TV sockets (piping, wiring and chipping).

N/A
6
100%
6.1

Relocate data points (piping, wiring and chipping).

N/A
1
100%
6.1

Relocate intercom points (piping, wiring and chipping).

N/A
1
100%
6.1

New switches and sockets (piping, wiring and chipping).

N/A
40
100%
VO-01 Plumbing Changes
100%
6.1

Relocate floor drain.

N/A
6
100%
6.1

Relocate exhaust fan.

N/A
3
100%
VO-02 Waterproofing Flashing
0%
1.1

Supply and installation of aluminium flashing as an additional item to the originally quoted waterproofing works.

N/A
1
0%
VO-03 Additional Block Work
100%
1.1.2

Supply and installation of additional single-layer block work to all boundary walls (3 block courses per site instruction).

N/A
1
100%
VO-03 Bedroom Ceiling Switching
100%
1.1.3

Changes to bedroom ceiling light switching system — two-way loop switching for all bedrooms.

N/A
1
100%
VO-04 Kitchen Revisions
100%
1.1.2

Revisions to exterior kitchen wall lighting, electrical sockets, and power outlets.

N/A
1
100%
1.1.3

Revisions to interior kitchen wall lighting, electrical sockets, and power outlets.

N/A
1
100%
VO-04 Gypsum & Niches
100%
1.1.4

Supply and install gypsum wall cladding and partitions in the master bedroom.

N/A
1
100%
1.1.6

Master bathroom: new niche opening and plastering, 500mm x 800mm, incl. lintel 200mm x 1200mm.

N/A
1
100%
1.1.7

Master bathroom: new niche opening and plastering, 300mm x 1300mm, incl. lintel 200mm x 1500mm.

N/A
1
100%
1.1.8

Bedroom 1 bathroom: new niche opening and plastering, 200mm x 1000mm, incl. lintel 200mm x 1200mm.

N/A
1
100%
1.1.9

Bedroom 2 bathroom: new niche opening and plastering, 200mm x 1000mm, incl. lintel 200mm x 1200mm.

N/A
1
100%
1.1.10

Bedroom 3 bathroom: new niche opening and plastering, 200mm x 500mm, incl. lintel 200mm x 700mm.

N/A
1
100%
VO-04 Parquet Substrate Tiles
100%
1.1.11

Supply of low-cost ceramic/porcelain base tiles to receive parquet flooring.

N/A
54m²
100%
VO-05.1B Doors
0%
1.1.1

Supply and install single swing door, MDF + red oak, W1000 x H2300mm.

N/A
14
0%
1.1.2

Supply and install double swing door, MDF + red oak, W1500 x H3800mm.

N/A
1
0%
1.1.3

Supply and install double sliding door, MDF + red oak, W2000 x H2300mm.

N/A
1
0%
1.1.4

Supply and install double sliding door, MDF + red oak, W3000 x H2300mm.

N/A
1
0%
VO-05.2C Wall Stone
0%
1.1.5

Supply and install Omani stone cladding with mechanical fixation (50% of Majlis).

N/A
395m²
0%
VO-05.3C Stone Steel Structure
0%
1.1.7

Supply and install complete steel structure framework for villa front facade.

N/A
1m²
0%
VO-05.4C Shower Glass
0%
1.1.8

Supply and install 12mm tempered clear glass shower partitions (all bathrooms).

N/A
1
0%
VO-05.5C Sliding Gate
0%
1.1.9

Supply, fabrication and install manually operated sliding gate (mild steel), 3000mm x 5000mm.

N/A
1
0%
VO-05.6C Qalex Upgrade
91%
1.1.12

Additional charge for upgrading U-shaped windows from UPVC to Qalex aluminum system.

N/A
1
91%
VO-05.7C Exterior Tiles Walkway
60%
1.1.12

Supply of exterior high-strength 20mm x 800mm x 400mm ceramic stone composite floor tiling (walkway & driveway).

N/A
185m²
60%
VO-05.9C Exterior Tiles PH Balcony
60%
1.1.12

Supply of exterior high-strength 20mm x 800mm x 400mm ceramic stone composite floor tiling (PH balcony).

N/A
65m²
60%
VO-05.9.8 Car Shade
0%
1.1.12

Supply and install custom car shade 6000mm x 5000mm, galvanized steel frame, PVC ceiling.

N/A
1
0%
VO-05.9.9 Bathroom Wood Panels
0%
1.1.12

Supply and install premium flat veneer-faced MR MDF wall panels to bathroom walls above toilets.

N/A
25m²
0%
VO-06.01 Parquet
0%
1.1.12

Supply and install premium European waterproof engineered parquet flooring, 20mm x 120mm planks with acoustic underlay.

N/A
205m²
0%
VO-06.02 PVC Skirting
0%
1.1.12

Supply and install premium white PVC skirting, 150mm high, all villa hallways and bedrooms.

N/A
395
0%
VO-06.03 Water Holding Tank
60%
1.1.12

Underground drinking water holding tank 2500mm x 2500mm x 2000mm — reinforced concrete, complete.

N/A
1
60%

Notes of the Day

No notes for today yet.

Submittals

0 total

No submittals uploaded yet.

Daily Progress Photos

31 Oct 2026· 22 photos
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
28 Oct 2026· 15 photos
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
27 Oct 2026· 24 photos
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
26 Oct 2026· 26 photos
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
25 Oct 2026· 3 photos
Site progress
Site progress
Site progress
20 Oct 2026· 27 photos
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
18 Oct 2026· 39 photos
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
16 Oct 2026· 20 photos
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
06 Oct 2026· 21 photos
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress
Site progress

Khalid Janahi Villa

Bill of Quantities · Progress Tracker · Rev 6 · 26/3/2026 · Prepared for Khalid Janahi